Kitchen remodeling

Kitchens planned around how you actually cook and live.

A kitchen remodel touches nearly every trade in the house — framing, plumbing, electrical, drywall, flooring, cabinetry, countertops and tile. We coordinate all of it so the work happens in the right order and you have one point of contact from demolition through the final walkthrough.

What we do

Kitchens services

Every job starts with a site visit and a written scope, so you know exactly what is being done and why.

Start an estimate request
Full kitchen remodels
Down to the studs when needed — new layout, systems, finishes and appliances.
Layout & wall changes
Opening walls, relocating sinks and ranges, adding islands — with structural work handled properly.
Cabinetry & countertops
Stock, semi-custom and custom cabinetry with quartz, granite, solid surface or butcher block counters.
Tile & flooring
Backsplashes, tile floors, hardwood and luxury vinyl plank installed on a flat, sound substrate.
Lighting & electrical
Recessed, under-cabinet and pendant lighting, dedicated appliance circuits and code-required outlets.
Plumbing
New supply and drain lines, sink and dishwasher hookups, pot fillers and gas line coordination.
Kitchens after work
Kitchens before work
BeforeAfter
Illustrative imagery — to be replaced with completed project photography.

Before & after

A dated oak and laminate kitchen compared with new cabinetry, quartz counters and lighting.

Drag the handle — or use your arrow keys — to compare. Illustrative example; project photographs will be added as work is documented.

Know before you call

How a kitchen comes together

Sequence matters. Here is the typical order of work on a full kitchen remodel.

  1. Phase 1

    Plan & select

    Layout, cabinetry, counters, fixtures and appliances are chosen and ordered before demolition so the kitchen is not torn out while waiting on materials.

  2. Phase 2

    Protect & demolish

    We protect floors and adjacent rooms, then remove cabinets, finishes and anything coming out.

  3. Phase 3

    Rough-in

    Framing changes, plumbing, electrical and ventilation are roughed in and inspected where required.

  4. Phase 4

    Close up

    Insulation, drywall, and flooring go in, followed by primer and paint.

  5. Phase 5

    Install

    Cabinets are set and leveled, counters are templated and installed, then tile, fixtures and appliances.

  6. Phase 6

    Finish & walkthrough

    Trim, hardware, final electrical and plumbing connections, punch list and a walkthrough together.

Questions

Kitchens FAQ

Can I still live in the house during a kitchen remodel?

Most clients do. We seal off the work area and help you plan a temporary kitchen setup in another room.

Do you provide design services?

We help with layout and material selections and can work with your designer or architect. For complex layouts we can recommend a kitchen designer.

Who handles permits?

When the scope requires permits — typically for structural, plumbing or electrical changes — we handle the applications and schedule inspections.

How do you keep the budget under control?

By making selections before work begins, writing a detailed scope, and discussing any change in writing before it happens. Older homes can hide surprises; when we find one, you will hear about it before we proceed.

Free estimates

Ready to talk about your kitchens project?

Send a few details and photos. We will follow up to talk through the work, schedule a visit and prepare a written estimate — at no cost.